If you have been reading this blog over the last year there has been one major theme, aside from snow. When can I get on my land so I can build?
All last summer the unusual amount of rain made my new driveway treacherous. All winter there was enough snow that we weren’t going to try. This spring we were waiting for it to melt. And now we wait for the mud to dry out some more.
One of the things that kept coming up when I was looking at land a considering the purchase of the property I now own was that you always look at access and water. I know how to handle water for consumption on the property and I know where most of the water flows across or collects on the property. I’m mostly okay with that at this point. What I’m struggling with is access.
Putting in the driveway was a great starting point. Now I really need to put in some time, effort, and gravel. That means money. I think I’m going to get off my butt and call up a local gravel company to see what it’s going to cost me to get started. If I can get something done on that then I will have an easier time getting started on all the other things that need doing.
Part of the reason we went to check on the property was to see if our plywood was still there. I bought a stack of 5/8 and 20 sheets of tongue and groove subfloor last fall. I’m glad I did. Bulk price on the 5/8 was under $25/sheet last year. I just checked and it’s going for $67/sheet now for the same stuff. The subfloor is over $90/sheet now where I think I paid $60. I have a slightly irrational fear that it will grow legs. Maybe that comes from where I grew up, but at this point it might be worth the bother to someone.
I also succumbed to temptation and tromped across more of the land. I know we’ll extend the driveway in the future. I want to put in a guest cabin or two and maybe a second residence. This place is big enough to do some interesting things. I didn’t get very far, but I love what I saw. I can’t wait.